Wastewater treatment plant
Renovation of the biological tanks and secondary settlers, as well as the interior surface treatment of new structures, in the wastewater treatment area, under the general contractor Keviép. After 1,800 bar water cleaning, the surfaces are leveled using Schomburg’s surface leveling mortar, followed by the application of a special, flexible, high chemical resistance two-component waterproof coating on the existing concrete surfaces. The materials are applied using a mortar spraying pump.
Steel surfaces associated with the structures are coated according to MOL specifications using the Tikkurila system after high-pressure water cleaning.