ANL-CT3 construction
We are carrying out the reconstruction of the ANL-type spraying tower and the CT3-type cooling structure in a consortium, with us as the leading partner. We have been involved since the design phase and oversee the entire execution, maintaining a constant presence due to the tight deadlines and the scale of the project.
This is one of the country’s most fascinating and largest structures, and it presents significant challenges for us as well.
Applied technology: 2,000 bar water cleaning, 6 cm shotcrete application, followed by a 500 bar rinse, then a three-component waterproof epoxy mortar layer is applied. Inside the structures, a 2,000-micron chemical-resistant epoxy coating is applied, while outside, a flexible, weather-resistant water-based coating is used.